Hi Guys,
I'm trying to get new safety flooring fitted in my new extension, that will run up the walls to form a waterproof skirt.
The fitter has told me that battens and skirts need fitting 1st so the flooring has something to attach to. I think this is because there is a dip back to the dpm and blockwork below the plaster line, so there's only the walls DPM to fix the flooring to currently.
I'm trying to do this myself as I live very rurally and builders often begrudge travelling out here for small jobs:-).
BUT, I've got the wall DPM coming down the blockwork, below the concrete floor, and then the new floor dpm coming up from the floor.
How do I attach battens and skirts without penetrating or compromising either DPM.?
I can't use glue as they will just be attaching very loosely to both sections of DPM.
Is there a product I can buy that will seal any screw holes I make in the DPM? I've already bought waterproof gorilla glue, stayfix and no more nails for other projects.
I'm just a bit lost with how to fit these battens/skirts without damaging either DPM. I have looked for videos, but there are none to do with fitting skirts over a DPM?
Any advice would be greatly appreciated. I've been waiting over a year to get this flooring down!