by Holywood »
Tue Mar 17, 2015 4:13 pm
My plans show 60mm rock wool requirement in the ceiling beneath a loft extension floor to achieve 1/2 hr fire protection. Can anyone tell me please whether a wire mesh is necessary to support the rock wool or whether it is sufficient to wedge the flexi rock wool slabs between the joists? Rock wool technical tell me that the 1/2 fire protection is achieved by the plasterboard ceiling on its own! Thanks for any help.