Could someone tell me if this is typical please? I’m looking to remodel a house and have been quoted £1500 for a measured building survey, £2400 to go through the concept design (RIBA stage 2) and £2400 to go through the developed design (RIBA stage 3). To pay over £6000 to see if the project is via...