Hi Stoneyboy, Thanks for that. I'm planning to be laying 5 x 6 slabs (45cm sq) onto dug out soil/garden, starting with weed membrane, then MOT1 layer, then the pre-mixed slablayer (Wickes) then the slabs. Wasn't sure to start with laying a length of edging blocks (60cm each), 1st from dwarf wall, th...