I just replaced a chipboard floor and behind the skirting boards the plasterboard has a gap that is up to 4cm high and 3cm deep to the blockwork. There is also a gap of up to 15mm betwwen the flooring and the blockwork. Ideally I want to seal the gap at the bottom of the dot and dab plasterboard, th...