Afternoon, I'm trying to design and simplify the ground floor waste layout on a barn conversion. The groundfloor will be based on a concrete slab so all pipework will be permanent and it is essential it's correct and easily unblocked if required. The ground floor has two ensuites, a WC and a utility...