Hi All I have a wet UFH system on a joisted timber floor with the heating pipes in between the joists, a biscuit screed and then 20mm plywood on top. I'm coming to install LVT and have been advised that I need to overboard again with 6mm ply to create a totally flat floor. I don't want to add more p...