ive wired my cu like the picture below, but the rcd trips out every time, ive checked all connections & they seem ok, but ill check again, does everything look okay or am i doing something wrong, thanks. ps please excuse the drawing
hi, ive looked through the forum & im still not 100% sure the way to go(too many different opinions) just want a clear answer. the mains water pipe comes in which im going to bond & send to cu, then the mains pipe goes to plastic after 1m, then all the pipework throughout the house is plasti...
hi all, just wanting some info please, is 16mm earth to cu from main correct, then from cu 10mm to water/gas house side. Also all pipework(exept gas) to boiler is plastic until they come down the wall to boiler approx 1m of copper, do i need to cross bond these & go back to cu or dont i need bot...