Search found 2 matches

by donttrythisathome
Wed Apr 16, 2008 9:54 pm
Forum: Flooring and Floor Coverings Forum
Topic: suspended wooden floor -> concrete floor
Replies: 6
Views: 8981

planning permission is not required but it would only need to comply with building regulations. high water levels would not be a problem as the slab would need to be laid with a 1200 gauge dpm. Suspeneded timber floor are more energy efficent when insulated properly than a concrete slab tho a slab w...
by donttrythisathome
Wed Apr 16, 2008 9:47 pm
Forum: Flooring and Floor Coverings Forum
Topic: Squeaky floor
Replies: 1
Views: 4502

Floor joist are usually laid out at either 400mm 450mm or 600mm centres if set to trada stds.
It is currently Thu Sep 19, 2024 5:15 pm