Hi I am building a single story extension on to a house the extension is concrete beam & block floor with brick /blockwork walls and timber roofing structure with redland tiles. I have dug a pilot hole to see what the ground is like after 400mm I hit chalk, I dug out another 300mm and the chalk ...