plumbbob. i have just looked at the pipework at the end of the long run to the cold rads. the 15 copper pipe feed runs about 4 meters away from the boiler and at the end goes in to a 90 facing straight up, it the runs straight up for about 2 inches then into a tee which goes left to one rad and righ...