Hi there I checked the pipework this evening. The order on the feed pipe from boiler is expansion, cold feed, pump. The expansion pipe and cold feed are more than 150mm apart, more like 300mm. I did the "glass of water under the expansion pipe" test and then switched on the heating & p...