Hi. A common practice in this situation is to rip up the wooden floor, then dig down to a suitable level, then fill with the appropriate depth of hardcore ( we use lime stone 40mm to dust around here as it is local and cheap), blind with sand. then in with visqueen sheet , then concrete. Hope this g...