Just had a new GCH system fitted using worcester/greenstar 28i and 10 new rads. Payed 2.5k and most of the job went ok. Lads were gas safety registered. However, I never checked the gas condensing outlet until after they left (stupid I know). The boiler is based on the 1st floor bathroom which backs...