on sundial y plan before changeing a V4073 mid valve, I checked the wiring control strip to the y plan but found that the blue wire from T6360B room stat was to terminal 10 (no other wire conected) instead of No 2, after isolating power I checked stat and found only terminals 1 & 3 conected also...