I have just recently finished a wet room, it took me 2 weeks. i shaped the floor with leveling compound to get the fall to the gulley/drain, then i tiled the floor and all the walls. The bathroom was 2.4 meters wide by 5 meters long. In that 2 weeks i also installed the bathroom suite and shower. Ha...