Hi everyone, I am looking at knocking through 2 reception rooms into one, i have been advised that regulations recently changed and the maximum gap i can have is reduced because there is an existing arch in the hall way next to it. Its a load bearing wall.. i have drawn the layout below.. kind of! D...