Hi, I have just replaced the old lead pipe underground with 32mm MDPE (used 32mm as it's going to split off to 2 25mm pipes). I now want to replace the mains valve (i.e. stop tap at the boundary) before connecting it back up, as I have noticed that it is broken. The main supply pipe (outside the bou...