Many thanks, this is what I thought, but I was told the floor should go down first, something to do with water run off, but I think that is only needed (maybe) in a full wet room. As this is not what I am doing the wall will come first then.
I am about to start tiling an en suite shower room. I have the walls and the floor to tile. I have been given conflicting advice as to which to tile first, the floor or the walls, which would be the best to tile first?