Hi all. I began creating a patio 20m x 20m but the soil was poor so I dug down 2 foot with the idea that I would fill the large hole with hardcore, then mot on top and then finally lay the patio. However, I was ready to back fill with the hardcore/mot when we had 5 straight days of heavy rain. I hav...