Hello I've laid wet UFH in the new extension (suspended floor) as follows: 1) 3 loops (about 80m each) in the zone. 2) 2 port valves for 3 zones on the flows (UFH, upstairs rads, downstairs rads). The pressure test indicates no leaks in any of the loops. When the valve to the UFH is closed, the pres...