Hello, I have dug a trench for a forth coming Summer House. Trench is 28m long and at right depth for services, ready to fill back in and wondering do I need to use any bedding. The pipe is flexible hdpe pipe and then an armour cable above, all spaced and taped, so I presume bedding is to stop defor...