Hello all, I really need some advice having never attempted anything like this before. I am attempting to build a 28m² patio and so far I have: Dug out soil to 150mm Added 5 tonnes of type 1 MOT sub-base I still need to add another tonne but I'm worried about levelling (with the drop) as the size of...