by keen2try »
Tue Jul 01, 2008 10:35 pm
Thanks for replying. It's a Biasi Riva Compact Condensing C24 boiler. The deal is from a good local builders merchants and includes 7 radiators up to 30000BTUs, 7 TRVs and 7 lockshield valves (incl VAT).
I wouldn't touch any of the gas fitting, I'd leave that for someone qualified. I'd thought of putting the pipework under the floor, by running a 'spine' of pipes from back to front, with pipes off to each radiator. But it would mean drilling through the joists so is it worth it?
I'm just not sure where to start so any advice or pointers is much appreciated.