Hi All,
Fitting a new shower in the first floor ensuite. Existing shower has a deep shower tray raised off the floor, and the shower waste is boxed in to one side of the room and exits into a strap-on boss into a horizontal toilet soil pipe.
I would like to fit a slim 40mm high shower tray resting on the floorboards and run the new shower waste under the floorboards and into the horizontal soil pipe.
My concern is that the soil pipe is running horizontally not much below the floorboards. Thus if my shower waste is already under the floor boards at the shower tray end plus a fall on the waste pipe means the soil pipe is a bit too high. Could I fit strap-on boss onto the side of the soil pipe i.e a bit above the centerline.
Are there any other options :?:
Thanks in advance :)