by elwood »
Sat Feb 21, 2009 6:21 pm
Hi
If your are inexperienced at laying slabs the best method is,
find the highest point on the existing patio, this will be your starting level.
set up some screed rails allowing a 30mm bed above your highest point,
allow for falls required.
mix sharp sand and cement 4 to 1 mix (put through a mixer)slighty damp.
roughly spread the mix around, then level off by dragging a straight rail
over the screed rails leveling the mix .
lay slabs.
if pointing is required use 4 to 1 mix including fed mix and building sand
just mix workable amounts at a time making sure you gauge the mix every time.
Be aware of your new finished level and DPC on your house