My first post so here's hoping for a good responce.
I'm laying solid oak planks using MS Polymer adhesive, there is no information on the container giving any indication on how long after laying it can be walked on. I've checked with the supplier and they seem reluctant to give me a time saying things like it varies on temperature and moisture in the air.
Anyone any idea how long i should leave it before walking on the floor ?
Thanks