New Circuits and Consumer Unit woes
Ask questions and find answers to many subjects relating to electrics and electrical work

2 posts   •   Page 1 of 1
Gremlin
Labourer
Labourer
Posts: 1
Joined: Fri Aug 31, 2007 10:59 pm

New Circuits and Consumer Unit woes

by Gremlin » Fri Aug 31, 2007 11:32 pm

I'm in the process of finishing off an extension to my house and finally getting round to sorting out the electics. The existing consumer unit only has a single spare way, but I'm planning to put four new circuits in the extension - upstairs lights, downstairs lights, ring main and electric shower.

I guess that I could get a bigger consumer unit fitted, but given where it is, and the awkward access to the existing cables I'm reluctant to do that, so I'm inclined to either using the existing spare way to supply a new (4 way) consumer unit, or tee the existing consumer unit tails to supply the second consumer unit. Questions therefore are:

1. Are either of these two solutions acceptable under the regs?
2. If I go for the first one, will I be OK just fitting a 50A MCB - my concern here is that if the shower is in use and there is a reasonably large load on the ring main, then the MCB may trip.
3. If I tee into the consumer unit tail, then I guess that the main fuse will need to be pulled - but what then happens about re-instating the seal?

Before anyone comments - I know that this work is all covered under the building regs and will need to be appropriately certified, but I've done 100% of the extension myself (and have got used to the local building control inspections) and I'm determined to do as much of the electrics as possible. Advice gratefully received..

BLAKEY1963
Site Agent
Site Agent
Posts: 684
Joined: Wed Jun 13, 2007 11:57 pm

Re: New Circuits and Consumer Unit woes

by BLAKEY1963 » Mon Sep 03, 2007 7:35 pm

[quote="Gremlin"]I'm in the process of finishing off an extension to my house and finally getting round to sorting out the electics. The existing consumer unit only has a single spare way, but I'm planning to put four new circuits in the extension - upstairs lights, downstairs lights, ring main and electric shower.

I guess that I could get a bigger consumer unit fitted, but given where it is, and the awkward access to the existing cables I'm reluctant to do that, so I'm inclined to either using the existing spare way to supply a new (4 way) consumer unit, or tee the existing consumer unit tails to supply the second consumer unit. Questions therefore are:

1. Are either of these two solutions acceptable under the regs?
2. If I go for the first one, will I be OK just fitting a 50A MCB - my concern here is that if the shower is in use and there is a reasonably large load on the ring main, then the MCB may trip.
3. If I tee into the consumer unit tail, then I guess that the main fuse will need to be pulled - but what then happens about re-instating the seal?

Before anyone comments - I know that this work is all covered under the building regs and will need to be appropriately certified, but I've done 100% of the extension myself (and have got used to the local building control inspections) and I'm determined to do as much of the electrics as possible. Advice gratefully received..[/quote]
GREMLIN
MORE INFO !
IS YOUR LOCAL BUILDING CONTROL INSPECTION TEAM WHO
AS U STATE HAVE CARRIED OUT INSPECTIONS , GOING TO
TEST YOUR ELECTRICAL INSTALLATION AND GIVE U THE COMPLETED
ELECTRICAL INSTALLATION CERTIFICATE ?????????????????

BLAKEY1963