Repairing Inspection Chamber That was Left and not Finished

by Airsick » Tue Aug 17, 2021 3:59 pm

Howdy folk, got an IC and drain job that's been left half done by the groundworker I hired.

Would really appreciate any advice on how to patch up this IC as there's a nice big hole in it, asking for debris to fall into the pipework.

Difficult to see in the picture but the depth is about 1.5 foot below ground level. Don't think BCO will be happy as he wanted the rodding point above the plastic!