Evening everyone...
I'm planning to fit a heated towel rail in a bathroom, I was planning to tap into the socket circuit and put a timer and isolator outside the bathroom. I would then earth bond to pipes, etc.. The only electrics which woul be in the bathroom would be the cable outlet from the wall - Is this accepted practice ?