CH vent & supply pipe combined?
Posted: Fri Apr 03, 2009 11:34 am
Hello all
Have been checking over my CH system - its fully pumped, open vented, microbore to rads - 2 separate valves after the pump instead of a 3 way.
Have seen many references about pipe layout mention order should be boiler flow - cold feed - open vent - pump.
My layout is boiler flow - combined vent/feed - pump.
The T piece on the flow from the boiler, before the pump, goes up towards the F&E tank and a T on it then branches to the bottom of the tank for the cold feed and the other branch goes up over the tank for the vent.
Is this layout OK as I have only seen mention on the web of separate pipes for feed & expansion that should be close to each other and between the boiler & pump?
Have been checking over my CH system - its fully pumped, open vented, microbore to rads - 2 separate valves after the pump instead of a 3 way.
Have seen many references about pipe layout mention order should be boiler flow - cold feed - open vent - pump.
My layout is boiler flow - combined vent/feed - pump.
The T piece on the flow from the boiler, before the pump, goes up towards the F&E tank and a T on it then branches to the bottom of the tank for the cold feed and the other branch goes up over the tank for the vent.
Is this layout OK as I have only seen mention on the web of separate pipes for feed & expansion that should be close to each other and between the boiler & pump?