Page 1 of 1

S-Plan Heating Wiring Problem With Boiler Pump Still Running

Posted: Sat Jun 02, 2018 10:14 pm
by Darrenb73
I have completed my S plan heating wiring system. The hot water and heating motorised valves both work correctly when demand is needed. When no valves are calling for heat, the boiler pump still runs and when the boiler temp drops it fires to maintain temperature, can anyone help??

Re: S-Plan Heating Wiring Problem With Boiler Pump Still Running

Posted: Tue Jul 31, 2018 7:37 pm
by ericmark
Normally boiler and pump come on together, the thermostats work the valves, and the valve micro switches work boiler and pump.