Concrete, skimming and quotation

Posted: Sat Oct 17, 2009 12:38 pm
by Lisa
I had a 5 mz skimming of concrete in my kitchen (plan is to tile over). The whole process took the contractor approx 1 hour 15 mins. At one end of the skimming, just under the kitchen unit, there was a length of built up Cement(?) powder of about 2/3 inches. Is this common practise? It was not mentioned to me by the guy who did it at the time. Also should there be some sort of seal on top the now skimmed floor, as the dust is everywhere. This job cost £130 was that reasonable.

TILING
The same guy quoted me £ 620 for labour to tile the said kitchen floor and the walls approx 12 mz. Is this reasonable?

ANY ADVICE WOULD BE APPRECIATED

Posted: Mon Oct 19, 2009 9:24 pm
by stoneyboy
Lisa,
Your contractor should have used self levelling compound, from your description and cost is sounds like he used a standard concrete mix.
If the surface of the skimming is soft then it has not been done correctly and extra work will be needed to stablise the surface.
Difficult to say if the tiling quote is reasonable - depends on the tiles, their size and how complex the walls are eg sockets, windows etc. Suggest you get someone else in to give a price. Offer cash for a fixed price - you should find it a lot cheaper.
end

Help from DIY Doctor!

Posted: Mon Jun 28, 2010 8:04 pm
by TheDoctor4
Discover how easy it is to find vetted and insured tradesman local to your area with the help of DIY Doctor. Visit our Find a Tradesman area: https://www.diydoctor.org.uk/find_tradesmen/