Self levelling latex screed in shed/office
Posted: Sun May 03, 2020 8:12 pm
Hi
I am looking to use some self levelling latex/screed on my shed/office.
The concrete base is a little rough and as we concreted in two sections the first section, nearest the door is lower by about 3mm compared to the back section. Both sections are 3.83m X 2.66m.
What I am wondering is if I use latex screed to level and smooth everything out.
So that would be about 1mm to smooth out the back section, then working towards the door onto the front section, lay 4mm - (3mm to meet the original back level ) plus the additional 1 mm to meet the new level.
Or do I have to lay the 3mm first to level the front section to the back section. Then lay 1mm over the top (once first section dried) across the complete floor?
Many thanks in advance.
I am looking to use some self levelling latex/screed on my shed/office.
The concrete base is a little rough and as we concreted in two sections the first section, nearest the door is lower by about 3mm compared to the back section. Both sections are 3.83m X 2.66m.
What I am wondering is if I use latex screed to level and smooth everything out.
So that would be about 1mm to smooth out the back section, then working towards the door onto the front section, lay 4mm - (3mm to meet the original back level ) plus the additional 1 mm to meet the new level.
Or do I have to lay the 3mm first to level the front section to the back section. Then lay 1mm over the top (once first section dried) across the complete floor?
Many thanks in advance.