Page 1 of 1

Bathroom Pipework Issues During Modifying Bathroom

Posted: Mon Aug 22, 2016 11:20 am
by Rockabilly
Hi, I am currently modifying our bathroom.
I have removed the shower unit and sink and I'm replacing with bath and new sink.
My problem is the pipework!
I have a 15 mm feed off the mains that fed to feed the shower which I've capped off.
I have a 15mm hot feed from boiler for the sink and a 15mm cold from a tank in loft that is cold supply for sink and toilet.
Now can I use the mains supply to feed sink, toilet and bath?
Therefore get rid of tank in loft?
Can I tee off the hot supply to feed bath?

Any advice very much appreciated.
Cheers Craig

Re: Bathroom Pipework Issues During Modifying Bathroom

Posted: Mon Aug 22, 2016 6:33 pm
by lets have a look
Depends if you have a combi boiler

Re: Bathroom Pipework Issues During Modifying Bathroom

Posted: Tue Aug 23, 2016 12:21 am
by Rockabilly
Sorry yes combie boiler

Re: Bathroom Pipework Issues During Modifying Bathroom

Posted: Tue Aug 23, 2016 6:17 pm
by lets have a look
Yes you can connect the bathroom to the cold mains and tee off the 15mm hot pipe for the bath

Re: Bathroom Pipework Issues During Modifying Bathroom

Posted: Tue Aug 23, 2016 7:04 pm
by Rockabilly
Great... Thank you