Page 1 of 1

First fix mixer shower before plastering

Posted: Thu Aug 03, 2017 9:56 am
by rdavies86
Looking for beat way to first fix shower with 150mm centres prior to plastering. Wall is lath and plaster but will be getting boarded over.

I have seen the easy fix kits for on top of plaster/tiles but what do I do before this.

Leave pipes sticking out in rough position and sort centres after plastering is done?

Thanks