Page 1 of 1

bathroom Vent Pipes for new Bathroom Build

Posted: Tue May 08, 2018 6:22 am
by robert10185
I am building a bathroom in my room addition,my drain pipes are all running together. I have a shower , tub, double vanity and a toilet. There is a 3 inch vent pipe behind the toilet drain and a 2 inch vent pipe off the shower drain.Do I need to run a vent pipe for the tub and vanity or will the two I have work for the whole system?

Re: bathroom Vent Pipes for new Bathroom Build

Posted: Thu Jun 28, 2018 12:37 pm
by RoyalBathrooms
I think the 3 inch pipe is enough for both drainage system. The 3 inch vent pipe can hold all the wastes and can easily move it to the waste area.