by BLAKEY1963 »
Sun Oct 14, 2007 4:44 pm
[quote="pg29"]Hi
I am having a small kitchen extension built and have gone through planning permision and Build regs Etc, If i want to add a couple of double sockets of the downstairs ringmain do i have to add a new consumer unit and run in new colour cable. Also the same with the lights in the kitchen, i want to add some more lights to the kitchen ceiling and a second switch and light in the kitchen, do i need to use trhe new colour cable or can i use the 2.5 black n red solid strand T&E. i have a reel in the garage?
Many thanks[/quote]
PG29
A NEW RINGMAIN WIRED IN HARMONISED COLOURS BROWN AND
BLUE , 2 . 5 MM2 TWIN AND EARTH , SHOULD BE DEDICATED AS A NEW RING MAIN FOR THE KITCHEN.
RED AND BLACK CABLE IS NO LONGER INSTALLED.
IF YOUR EXISTING CONSUMER UNIT IS NOT ABLE TO ACCOMADATE THE
ADDITIONAL LOAD , OR IS NEEDED TO INCLUDE ITEMS SUCH AS RCD S. THEN U WOULD HAVE TO CHANGE THE MAINS BOARD.
CONSUMER UNIT. R U AWARE OF THE PART P REQUIREMENTS , WHILE
U WERE DEALING WITH PLANNING PERMISSION AND BUILDING REGS.
( SEE DOC SITE HERE ON THIS FORUM ABOUT PART P INFO ).
THIS AREA WHERE U R DOING WORK IS CLASSED AS A SPEACIAL LOCATION , AND IS NOTIFIABLE WORK NOT DIY.
I AM SURE YOUR PART P SPARKY WOULD B ONLY 2 HAPPY TO ADVISE U
BLAKEY1963