confused about earting
Posted: Tue Mar 11, 2008 7:57 pm
hi,
ive looked through the forum & im still not 100% sure the way to go(too many different opinions) just want a clear answer.
the mains water pipe comes in which im going to bond & send to cu,
then the mains pipe goes to plastic after 1m, then all the pipework throughout the house is plastic even tap & rad fittings [b]except [/b]when attached to the boiler ive run copper for aprox 1m.
The mains gas pipe is bonded on house side & before any joints & sent back to the cu(gas pipe from mains to boiler is all copper).
the thing is:
1. do i need to bond the steel bath & kitchen sink & return to cu
2. do i need to cross bond pipes at boiler & send to cu
or do i need to bother with the above two at all, have i done enough,
thanks very much for your time.[/list]
ive looked through the forum & im still not 100% sure the way to go(too many different opinions) just want a clear answer.
the mains water pipe comes in which im going to bond & send to cu,
then the mains pipe goes to plastic after 1m, then all the pipework throughout the house is plastic even tap & rad fittings [b]except [/b]when attached to the boiler ive run copper for aprox 1m.
The mains gas pipe is bonded on house side & before any joints & sent back to the cu(gas pipe from mains to boiler is all copper).
the thing is:
1. do i need to bond the steel bath & kitchen sink & return to cu
2. do i need to cross bond pipes at boiler & send to cu
or do i need to bother with the above two at all, have i done enough,
thanks very much for your time.[/list]