Subfloor levelling 1983 Westbury timber framed house
Help, advice, information, answers and tips on all types of flooring from laminate and carpet to timber and vinyl

4 posts   •   Page 1 of 1
Reno1983
Labourer
Labourer
Posts: 2
Joined: Mon Oct 26, 2020 5:33 pm

Subfloor levelling 1983 Westbury timber framed house

by Reno1983 » Mon Oct 26, 2020 5:46 pm

Evening, first time poster, renovating a 1983 Westbury timber framed house.

We’ve knocked through the kitchen into the diner and need to level the floors. Currently both are vinyl tiles (glued down, could contain asbestos) on top of concrete, with a sunken wooden beam where the stud wall was. Kitchen screed is about 10mm higher, and level with the beam.

What’s the best way about this? Take the beam out, fill with concrete then use self levelling on the lot (with a decent primer)?

Thanks in advance

stoneyboy
Project Manager
Project Manager
Posts: 6537
Joined: Wed Dec 10, 2008 6:44 pm

Re: Subfloor levelling 1983 Westbury timber framed house

by stoneyboy » Tue Oct 27, 2020 11:02 pm

Hi reno1983
Your proposed solution is ok provided the tiles are firmly stuck down.
Regards S

Reno1983
Labourer
Labourer
Posts: 2
Joined: Mon Oct 26, 2020 5:33 pm

Re: Subfloor levelling 1983 Westbury timber framed house

by Reno1983 » Wed Oct 28, 2020 8:19 am

Hi stoneyboy, thanks for the reply. The tiles have snapped round the edges so I'm going to take them up as much as poss this weekend (according to HSE guidance). Whatever I can't get up will be ok left down. Do you think I need to remove the bottom plate of the stud wall or can I leave it in there?

stoneyboy
Project Manager
Project Manager
Posts: 6537
Joined: Wed Dec 10, 2008 6:44 pm

Re: Subfloor levelling 1983 Westbury timber framed house

by stoneyboy » Wed Oct 28, 2020 11:24 pm

Hi reno1983
Better to remove it otherwise you’ll probably get a crack in the concrete above it. Use a self levelling compound with latex to help the floor stick.
Regards S