Plasterboard to tile Jointing?
Posted: Thu Jun 19, 2008 4:23 pm
Hi all,
I think I am right in saying that when I dryline my en-suite bathroom I do not need to put any form of edging (metal or plastic) on the window resess/toilet framework etc.. where the plasterboard butts together if the whole room is going to be tiled from floor to ceiling? Any one disagree? :roll:
I think I am right in saying that when I dryline my en-suite bathroom I do not need to put any form of edging (metal or plastic) on the window resess/toilet framework etc.. where the plasterboard butts together if the whole room is going to be tiled from floor to ceiling? Any one disagree? :roll: