Door casing - how much to leave
Posted: Thu Mar 29, 2012 8:48 pm
hi all i gutted my house, hollow paster and took out old door frames.
i have a mix of stud and brick walls and was wondering if i left 15mm overhang for timber stud and 20mm for brick would that be sufficent for the plasterer to work up too??
i will be asking for 12.5mm boards.
thanks in advance
i have a mix of stud and brick walls and was wondering if i left 15mm overhang for timber stud and 20mm for brick would that be sufficent for the plasterer to work up too??
i will be asking for 12.5mm boards.
thanks in advance