Moved pump now a problem

Posted: Sun Aug 10, 2008 7:55 pm
by Mark11
Can any one help, I've had to move my hot water cylinder, pump and 3PV. The cylinder has move to the other end of the house and the pump and 3 PV has been move to the roof. the pump is about 6-10" below the F&E tank. (Grundfos 3 speed on top speed)
I have put a short ciruit in near the 3 pv for venting and flushing when this is open i get full flow around the boiler, when i isolate the short ciruit i cannot get flow aroung the rads and struggle to get any flow to the cylinder. even when i try just htg or just hw. wiring is correct and the plumbing is re-connected correctly as before. 3pv is new.

any ideas?? is there a minium header required for the pump?