by plumbbob »
Tue Nov 29, 2011 8:29 pm
The only way to do this is to cut out a section and "adapt" a coupling so it will slide along the pipe. Replace the cut out section and slide the coupling back along to re-connect the pipe. Cutting out a section means you will end up with two joints.