Good evening all,
I’m wondering if someone can advise me on best route to take when re-plumbing my house.
I have uploaded a floor plan of my house, the boiler will be in the kitchen (the red squiggle), the blue squiggles are all the rads.
My initial thought was to come from the boiler 22mm flow then tee going left to pick up bed 1 and bed 3 the to the right of the tee go along the landing into the bathroom and pick up the bathroom and bed 1 from there then drop downstairs and pick up everything down there. Then just follow the route for the return.
There will also be a rad in the conservatory but that’s not mark on there.
Any help would be appreciated, as il be doing all the pipe work myself but will be getting someone in to fit the boiler.
Thanks