Page 1 of 1

plastic piping up to boiler

Posted: Tue Sep 11, 2007 11:16 pm
by brickiepaul
When installing a new boiler, how much copper tube has to be used before going into plastic, I'm sure I've seen something about having the first metre or so in copper then its ok to use plastic (gas not included of course), does anybody know the correct distance if any?

Posted: Thu Sep 13, 2007 5:10 pm
by lanciabrad
600mm