Help on Preparing/levelling concrete floor for tilling
Posted: Mon Dec 21, 2009 6:26 pm
Hi all
I have a concrete floor in my kitchen, which is to be tilled with ceramic floor tiles. The floor isn't completely flat/some bumps etc, so I intend to use self levelling compound to level. Then tile after. (makes sense)
What is the correct process to do this.... this is what I am thinking but am not 100% sure, any help would be great.
1: Apply PVA to concrete floor
2: Wait 1.5-2 hours for PVA to set
3: Apply Levelling compound to floor/level out
4: Allow to dry out
5: Apply PVA again to the newly laid floor (not sure on this bit) but imagine its correct
6: wait for 1.5-2 hours for PVA to set
7: Then apply floor tile adhesive
8: Lay tiles etc etc
Thanks
I have a concrete floor in my kitchen, which is to be tilled with ceramic floor tiles. The floor isn't completely flat/some bumps etc, so I intend to use self levelling compound to level. Then tile after. (makes sense)
What is the correct process to do this.... this is what I am thinking but am not 100% sure, any help would be great.
1: Apply PVA to concrete floor
2: Wait 1.5-2 hours for PVA to set
3: Apply Levelling compound to floor/level out
4: Allow to dry out
5: Apply PVA again to the newly laid floor (not sure on this bit) but imagine its correct
6: wait for 1.5-2 hours for PVA to set
7: Then apply floor tile adhesive
8: Lay tiles etc etc
Thanks