Page 1 of 1

tiling over breeze block

Posted: Wed Jul 18, 2007 12:59 pm
by jtat76
Hi, is advisable to tile straight onto breeze block or should I plaster 1st. Also if i have to plaster, how long do i need to leave it b4 i can tile over.
Thanks

tiling on bare blocks.

Posted: Wed Jul 25, 2007 5:38 pm
by martin497
Hi jtat76, you cannot tile onto bare brick or blockwork walls.
Have the walls plastered and the you must wait at least 4 weeks before tiling.