Page 1 of 1

Preparing Breeze Block Wall For Tiling

Posted: Tue Sep 24, 2013 1:57 pm
by FEP
Hi,

I am installing a shower and have taken down half height tiling on three walls around my bath. i intend to replace with tiles up to the top of the walls.

On removing the old tiles, much of the tile cement came off taking the top of the plaster coat underneath with it. The majority of the walls are now a rough plaster surface. Some of the tiles left the cement in place and having carefully removed any cement/plaster that was loose, there are patches of sound tile cement. In one or two small patches the plaster has come away revealing the (1930's) breeze blocks underneath.

Putting up new boarding seems overkill and would probably necessitate me having to re-position the bath which I don't want to do. Reading around the web there seem to be many different ways of preparing the surface for new tiling. In my simple world a coat of bonding would cover the walls imperfections and be flat enough to tile to. Am I wrong? Any suggestions?

Cheers,

FEP

Re: Preparing Breeze Block Wall For Tiling

Posted: Wed Sep 25, 2013 7:35 am
by welsh brickie
its best to fill in any holes with plaster and make the surface as flat as possible, you can use drywall adhesive

Re: Preparing Breeze Block Wall For Tiling

Posted: Wed Sep 25, 2013 9:32 am
by FEP
welsh brickie wrote:its best to fill in any holes with plaster and make the surface as flat as possible, you can use drywall adhesive


Drywall adhesive to bond the tiles to the plaster?

Re: Preparing Breeze Block Wall For Tiling

Posted: Wed Sep 25, 2013 9:50 pm
by welsh brickie
no you use tile adhesive for the wall, cement based, but you use drywall adhesive to fill the holes before tiling