BUILDING REGS - POURING CONCRETE FOOTINGS - DWELLING
Posted: Thu Feb 11, 2010 12:20 pm
What is the Building Reg that stipulates pouring of concrete footings in a substantial house - 3 storeys?
Footings 6' + deep - on made-up land. Spoil estimated 150 cubic metres
Does the concrete have to be continuous or can it be poured on consecutive days? If the latter, what are reinforcing requirements?
Footings 6' + deep - on made-up land. Spoil estimated 150 cubic metres
Does the concrete have to be continuous or can it be poured on consecutive days? If the latter, what are reinforcing requirements?